Sailing Islands aboard Rovinkind II

Bow Thruster – Part 6 – Sealant on Thruster

Here is the thruster with sealant ready to be tightened up the nuts drawing it up to the hull.  Thus far the clock shows about 3 hours to get to this point.  I tightened up the nuts to draw up the thruster and we let the sealant cure for the night.  The next part cannot be started if the sealant is not cured.  When the thruster is pulled up the person on the outside must make sure it is level as the sealant cures.

Thruster_in_place2 Thruster_with_4200

 

Pulled_up

1 Comment
  1. Hey guys good luck

Leave a Reply